“Preparation of Second Cycle of Susurluk Basin Flood Risk Management Plan” contract was signed by Directorate General of Water Management and company officials.
Within the scope of the project;
* Preliminary Flood Risk Assessment (PFRA) will be carried out
* Hydrological studies will be carried out by applying well known methodologies used by national institutes as well as hydrological models
* 1D/2D Hydraulic modelling studies will be carried out and flood inundation and hazard, flood risk, flood evacuation maps will be developed
* Flood Risk Management Plan will be prepared