Description of Mardin Storage Pumping Irrigation Project

With the Project, 22,079 ha of agricultural area will be irrigated in Turkey’s Southeastern Anatolian Region of the Lower Euphrates basin. Within the scope of the work, design of the medium to high pressure pipe irrigation network and the state of art structures on the channels have been prepared. The entire irrigation network was designed as a pressured pipe network with a total length of about 589 km, with diameters ranging from 110 mm to 2,400 mm. In addition, 1 large pumping station was designed.

Main Features

  • Water Source: Atatürk Dam
  • Mardin Storage Approach Channel Length: 9.16 km
  • Main Transmission Channel Flow: 88.38 m³/sec
  • Total Irrigation Area: 22,079 ha
  • Irrigation Network: Medium and high pressure pipe irrigation system.
  • MD-1 Left Main Pipeline Length: 26.432 km
  • MD-1 Left Main Pipeline Discharge: 6.052 m³/sec
  • MD-1 Right 1 Main Pipeline Length: 37.606 km
  • MD-1 Right 1 Main Pipeline Discharge: 1.931 m³/sec
  • MD-1 Right 2 Main Pipeline Length: 8.049 km
  • MD-1 Right 2 Main Pipeline Discharge: 3.106 3.106 m³/sec
  • MD-1 Right 3 Main Pipeline Length: 7.815 km
  • MD-1 Right 3 Main Pipeline Discharge: 2.678 m³/sec
  • MD-1 Right 4 Main Pipeline Length: 32.042 km
  • MD-1 Right 4 Main Pipeline Discharge: 10.320 m³/sec

Where to Find Us

Aşağı Öveçler Mah., 1314. Cd.
No: 10/13, 06460 Çankaya / Ankara – Turkey

Give Us a Call

Phone: +90 (312) 472 78 10

Fax: +90 (312) 472 78 11

Bar-Su Project

Our Brochure          Cookie Policy          Contact

Scroll Up