Mardin Storage Pumped Irrigation Project (1st Phase)
Place
Mardin Province, Turkey
Client
General Directorate of State Hydraulic Works, Turkey
Year
2011 - 2019
Description of Mardin Storage Pumping Irrigation Project
With the Project, 22,079 ha of agricultural area will be irrigated in Turkey’s Southeastern Anatolian Region of the Lower Euphrates basin.
Within the scope of the work, design of the medium to high pressure pipe irrigation network and the state of art structures on the channels have been prepared.
The entire irrigation network was designed as a pressured pipe network with a total length of about 589 km, with diameters ranging from 110 mm to 2,400 mm.
In addition, 1 large pumping station was designed.
Main Features
Water Source: Atatürk Dam
Mardin Storage Approach Channel Length: 9.16 km
Main Transmission Channel Flow: 88.38 m³/sec
Total Irrigation Area: 22,079 ha
Irrigation Network: Medium and high pressure pipe irrigation system.
MD-1 Left Main Pipeline Length: 26.432 km
MD-1 Left Main Pipeline Discharge: 6.052 m³/sec
MD-1 Right 1 Main Pipeline Length: 37.606 km
MD-1 Right 1 Main Pipeline Discharge: 1.931 m³/sec
MD-1 Right 2 Main Pipeline Length: 8.049 km
MD-1 Right 2 Main Pipeline Discharge: 3.106 3.106 m³/sec
MD-1 Right 3 Main Pipeline Length: 7.815 km
MD-1 Right 3 Main Pipeline Discharge: 2.678 m³/sec
MD-1 Right 4 Main Pipeline Length: 32.042 km
MD-1 Right 4 Main Pipeline Discharge: 10.320 m³/sec