General Directorate of State Hydraulic Works, Turkey
Year
2014 - 2018
Description of Cermik Kale Irrigation Project
The Project is in Çermik of Diyarbakir Province in Turkey’s South-Eastern Anatolian Region.
With the Project, the irrigation and drainage networks, which will irrigate 13,942 ha. of agricultural land, and the final design drawings of the structures on it have been prepared.
The entire irrigation network has been designed as a pressure pipe network with diameters ranging from 110 mm to 3,100 mm, with a total length of about 409 km.
In addition, 1 pumping station as well as a TBM tunnel was designed within the scope of the Project.
Main Features
Water Source: Kale Dam
Total Irrigation Area: 13,942 ha
Gravity Irrigation Area: 7,111 ha
Pumped Irrigation Area: 6,831 ha
Irrigation Network: Medium and high pressure pipe irrigation system.
Gravity Main Pipeline Length: 29.617 km (9.375 km tunnel)
Cazibe Main Pipeline Flow: 14.152 m³/sec
Pumped Main Pipeline Length: 28.512 km
Pumped Main Pipeline Discharge: 7.17 m³/sec
Where to Find Us
Aşağı Öveçler Mah., 1314. Cd. No: 10/13, 06460 Çankaya / Ankara – Turkey